- Location: London
- Type: Refurbishment
- Client: Canary Wharf Group PLC
- Contractor: Bovis Lend Lease
- Year: 2002
Both Canada Tower and the new HSBC Bank HQ at Canary Wharf. have been fitted with Alumasc’s Derbigum and Hydrotech systems. In total, around 8,000 sq. m of the systems have been installed on a variety of deck areas, from ground level to the 44th storey. The systems were recommended because their robustness and ease of installation could meet the challenges of construction in a restricted area.