North West Cambridge Development Phase 1 (Lots 1, 2 and 3)

<
  • Location: Cambridge
  • Type: New Build
  • Contractor: Voland Roofing
  • Year: 2017

Alumasc Roofing Systems were specified throughout various roof areas by a joint venture with Mole and Wilkinson Eyre Architects on Lot 1 and 3 as well as Stanton Williams on Lot 2. A variety of Alumasc’s waterproofing systems have been installed including the Alumasc single source Derbigum Warm Roof System and Hydrotech Inverted BluRoof Drainage Systemas well as Hydrotech Hot Melt Waterproofing finished with Blackdown Green Roof systems. Alumasc’s BluRoof system reduces and controls the peak rate of stormwater discharge from roof areas.

Detention of storm water up to a prescribed maximum hydraulic head occurs, with subsequent discharge controlled over an elongated time period. Alumasc Registered Contractor Voland Roofing installed over 15,000m2 covering numerous roof areas on Lot 2 for Wates Construction.

 